ATTENTION:
BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPICS BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!
INFORMATION:
YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COST N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR
YOU CAN CALL: 08068231953, 08137701720
WHATSAPP US ON: 08137701720
ASSESSMENT OF INDUSTRIAL WASTES AS A ROAD CONSTRUCTION MATERIAL: A REVIEW
Abstract
The scarcity of conventional natural materials and the jeopardized environment have been compelling the tendency towards evolution of new or alternate materials and resources to be incorporated in sustainable infrastructure development. The inclusion of such materials entails several secondary and tertiary materials. Indeed, there is a strong thrust to investigate the feasibility of locally available industrial waste materials to replace the conventional construction materials. In India, vast network of existing industries spread across length and breadth of the country and many more to come in the near future, are certainly going to generate millions of tonnes of variety of waste and by-product materials. The pollution and disposal problems can be minimised to greater extent by properly utilising these materials in civil engineering applications. Several types of waste/by-product materials have already been investigated, assessed, and evaluated for utilization and practice in the field. In this paper, assessment of different waste materials produced by various industries was reviewed for ascertaining their suitability in the construction of rural roads, embankments, and subgrade layers. Physical, chemical and geotechnical properties of these waste materials have been critically evaluated for this purpose. From the results, it has been observed that most of the materials have potential to be selected as source materials for embankment and as a construction material in roads. Materials like steel furnace slag and zinc slag found to have their useful in partial replacement of aggregate for the construction of sub-base and base layers.
HOW TO RECEIVE PROJECT MATERIAL (S)
After paying the appropriate amount (#5,000) into our bank Account below, send the following information to
08068231953 or 08168759420
(1) Your project topics
(2) Email Address
(3) Payment Name
OR you drop them on our WhatsApp, 08137701720
We will send your material(s) after we receive bank alert
BANK ACCOUNTS
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 0046579864
Bank: GTBank.
OR
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 3139283609
Bank: FIRST BANK
FOR MORE INFORMATION, CALL:
08068231953 or 08168759420
http://graduateprojects.com.ng